Continental Drilling & Service in Shreveport, LA
Open for business since 1953
Open for business since 1953
-O.C. LaBorde
Iowa, LA project |
-Goodrich Petroleum
East Texas |
R-12 at Camp Beauregard
Pineville, LA |
-New water well and pumping station with storage tank and pressure tank for Dubberly, LA – 1998.
|
-New pumps being installed in new pump station at Dubberly, LA.
|
-Bird’s eye view of split face block pump station building CDS built on site for Dubberly, LA project.
|
-Wade Prison, Claiborne Parish, LA – 1988
Welding 8” stainless steel screens. |
-Test pumping a new well in Many, LA.
Note the natural gas flare. |
-New well, Holmesville Water System
South Union Parish, LA – 1998 |
-Tri State Oil Tool Learning Center project, circa 1987. Pulling the 46” bit out of the hole. Slim, Preston, Manuel and Carl. I was afraid Manuel might fall in the 46” hole! (It was only about 75’ deep.)
|
-Tri State Oil Tool Learning Center project, circa 1987. The 40” casing is a mast full of pipe. Note the size of the 40” alignment clamp in the back of the welder’s truck.
|
-Tri State Oil Tool Learning Center project, circa 1987. Preston at the controls while Manuel and Slim tail in a joint. After we set the 40” casing down to about 70’ we drilled a 36” hole 500’ deep and set 30” casing inside the 40” surface pipe.
|
-New Midway 1500 drilling rig in fall of 2000 with O.C. LaBorde, Jr.
|
-Bill threading column pipe in the machine shop. Late 1990’s.
|
-Crew pulling oil lubricated turbine pump out of the VA in Alexandria, LA – 2005.
|
-Roland in 1979 on a cathodic deep ground bed for pipeline corrosion control.
|
-Bird’s eye view of crew at West Grant Parish drilling site.
|
-This is two completed water wells at Start, LA, just east of Monroe.
|
-City of Alexandria, LA, project in 1988 off Hwy 28 West.
|
-Completed well at Camp Beauregard in Central Louisiana in 2000.
|
-Drilling a test hole in Sabine Parish during the winter of 2000.
|
-New water truck all loaded up with supplies and headed out to project in 1992.
|
-City of Alexandria, night operations 1988.
|
-Running casing at Fort Polk, LA – 1987. Shannon, Slim, Jack, James Edwards and Bubba.
|
-Jon LaBorde at Ward’s Chapel WS in North central Louisiana – 2002.
|
-Carl and Preston Niette getting ready to run an e-log in North Louisiana – 1986.
|
-Carl Niette pump testing a well around 1990.
|
-O.C. LaBorde, Jr. with Rig #1 at Lake Bistineau.
|
-Typical irrigation well in the Red River alluvial aquifer around 1985.
|
-I-49 dewatering wells during interstate construction at the 70th Street underpass in 1989.
|
-Running 1,600 feet of 16” casing in East TX, circa 2003.
|
-High production saltwater well 1,850’ deep in Tyler, TX – 2004.
|
-New well at Downsville, LA – 2007.
|
-Getting ready to e-log saltwater well in Tyler, TX in 2004.
|
-Pre fabricated pumping system for lumber mill in Dodson, LA circa 1990
|
-Tight quarters in a refinery drilling a deep ground bed for cathodic protection in North Louisiana.
|
-Compound meter with by-pass piping and restraining clamps ready for field installation in North central LA, – 2007.
|
-A shop built, pre-fabricated booster station ready for delivery.
|
-Setting 16” casing at Fort Polk, LA – 2003.
|
-Two newly completed wells for Evangeline Oaks Water System on Lake Bistineau, LA – 1999.
|
-Night operations, setting 16” casing at Greater Ward One Waterworks District near Ruston, LA – 2009.
|
-Three well project for Belmont Water System near Pleasant Hill, LA – 1994.
|
Sabine W/S 10" casing 900'
|
10" casing Sabine Welding 10" Casing
|
Bastrop, LA
|
Bastrop, LA
|
Bastrop, LA
|
Bastrop, LA
|
Bastrop, LA
|
International Paper; drilling reverse well - 2014
|
Tristate Oil tool job, circa1987
|
Tristate Oil tool job, circa 1987
|
Tristate Oil tool job, circa 1987
Carl sitting in the 48" casing. |