Continental Drilling & Service in Shreveport, LA
Open for business since 1953
-O.C. LaBorde
Iowa, LA project
-Goodrich Petroleum
East Texas
R-12 at Camp Beauregard 
​
Pineville, LA

-New water well and pumping station with storage tank and pressure tank for Dubberly, LA  –  1998.
-New pumps being installed in new pump station at Dubberly, LA.
-Bird’s eye view of split face block pump station building CDS built on site for Dubberly, LA project.

-Wade Prison, Claiborne Parish, LA – 1988
Welding 8” stainless steel screens.
-Test pumping a new well in Many, LA.  
Note the natural gas flare.
-New well, Holmesville Water System
South Union Parish, LA – 1998

-Tri State Oil Tool Learning Center project, circa 1987. Pulling the 46” bit out of the hole.  Slim, Preston, Manuel and Carl.  I was afraid Manuel might fall in the 46” hole!  (It was only about 75’ deep.)
-Tri State Oil Tool Learning Center project, circa 1987. The 40” casing is a mast full of pipe.  Note the size of the 40” alignment clamp in the back of the welder’s truck.
-Tri State Oil Tool Learning Center project, circa 1987. Preston at the controls while Manuel and Slim tail in a joint. After we set the 40” casing down to about 70’ we drilled a 36” hole 500’ deep and set 30” casing inside the 40” surface pipe.

-New Midway 1500 drilling rig in fall of 2000 with O.C. LaBorde, Jr.
-Bill threading column pipe in the machine shop.  Late 1990’s.
-Crew pulling oil lubricated turbine pump out of the VA in Alexandria, LA – 2005.

-Roland in 1979 on a cathodic deep ground bed for pipeline corrosion control.
-Bird’s eye view of crew at West Grant Parish drilling site.
-This is two completed water wells at Start, LA,  just east of Monroe.

-City of Alexandria, LA, project in 1988 off Hwy 28 West.
-Completed well at Camp Beauregard in Central Louisiana in 2000.
-Drilling a test hole in Sabine Parish during the winter of 2000.

-New water truck all loaded up with supplies and headed out to project in 1992.
-City of Alexandria, night operations 1988.
-Running casing at Fort Polk, LA –  1987.  Shannon, Slim, Jack, James Edwards and Bubba.

-Jon LaBorde at Ward’s Chapel WS in North central Louisiana –  2002.
-Carl and Preston Niette getting ready to run an e-log in North Louisiana –  1986.
-Carl Niette pump testing a well around 1990.

-O.C. LaBorde, Jr. with Rig #1 at Lake Bistineau.
-Typical irrigation well in the Red River alluvial aquifer around 1985.
-I-49 dewatering wells during interstate construction at the 70th Street underpass in 1989.

-Running 1,600 feet of 16” casing in East TX, circa 2003.
-High production saltwater well 1,850’ deep in Tyler, TX –  2004.
-New well at Downsville, LA –   2007.

-Getting ready to e-log saltwater well in Tyler, TX in 2004.
-Pre fabricated pumping system for lumber mill in Dodson, LA circa 1990
-Tight quarters in a refinery drilling a deep ground bed for cathodic protection in North Louisiana.

-Compound meter with by-pass piping and restraining clamps ready for field installation in North central LA, –  2007.
-A shop built, pre-fabricated booster station ready for delivery.
-Setting 16” casing at Fort Polk, LA –  2003.

-Two newly completed wells for Evangeline Oaks Water System on Lake Bistineau, LA – 1999.
-Night operations, setting 16” casing at Greater Ward One Waterworks District near Ruston, LA  –  2009.
-Three well project for Belmont Water System near Pleasant Hill, LA  – 1994.

Sabine W/S 10" casing 900'
10" casing Sabine                                           Welding 10" Casing

Bastrop, LA
Bastrop, LA
Bastrop, LA

Bastrop, LA
Bastrop, LA
International Paper;  drilling reverse well  -  2014

Tristate Oil tool job, circa1987
Tristate Oil tool job, circa 1987
Tristate Oil tool job, circa 1987
Carl sitting in the 48" casing. 


Picture
R-2

Picture
Skytop 
Picture
R-12
Proudly powered by Weebly